Installation and Commissioning
We carry out HV and LV installations to strict safety standards, with end-to-end project control and commissioning services. All installation work is undertaken by competent electricians and jointers working under a combination of PWR Serve & Client SSOW as required. Final testing and commissioning follows best Industry practices, cross-referencing site-specific and manufacturers procedures, ensuring all systems are energised safely and correctly.
- LV panel, switchboard, and cable system installation
- HV switchgear, transformer and substation equipment installation
- Current & Voltage Transformer testing, including ratio, knee-point verification, vector group and insulation withstand tests
- HV and LV cable testing (DC, VLF)
- Full protection scheme set-up – Primary and secondary injection
- Inter-tripping verification and system integration checks
- FAT & SAT witness & sign-off
- Detailed commissioning documentation — test sheets, O&M manuals, and as-built records
- Temporary power solutions and phased energisation support